Page 29 - AIF - English
P. 29











In addition, Suncor’s renewable energy interests include six Adelaide project received regulatory approval and 

wind power projects in operation. Suncor’s wind farms construction is expected to commence in the second 
have a gross generating capacity of 255 MW and avoid quarter of 2014. The Cedar Point project will continue to 

carbon dioxide (CO2) equivalent emissions of approximately progress through the regulatory process in 2014. The two 
395,000 tonnes each year, compared with traditional projects, based in Ontario, are expected to add 140 MW of 

power generation sources. Suncor continues to evaluate gross installed capacity, increasing the gross installed 
new opportunities to build its renewable energy portfolio capacity of Suncor’s wind projects by 55%.

with potential wind power project sites that are in various Suncor’s operating wind power projects:
stages of the evaluation process. In December 2013, the



Ownership
Wind Power Projects
Interest (%) Size (MW) Turbines Commissioned
Operated by Suncor
.......................................................................................................................................................................................................................................................
Wintering Hills Drumheller, Alberta 70.0 88 55 2011
.......................................................................................................................................................................................................................................................
Kent Breeze Thamesville, Ontario 100.0 20 8 2011
.......................................................................................................................................................................................................................................................
Non-operated
.......................................................................................................................................................................................................................................................
Ripley Ripley, Ontario 50.0 76 38 2007
.......................................................................................................................................................................................................................................................
Chin Chute Taber, Alberta 33.3 30 20 2006
.......................................................................................................................................................................................................................................................
Magrath Magrath, Alberta 33.3 30 20 2004
.......................................................................................................................................................................................................................................................
SunBridge Gull Lake, Saskatchewan 50.0 11 17 2002



















































SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2014 27



   27   28   29   30   31